by Carlos Murrieta | Feb 22, 2016
This new Cameron Chapter House building is being designed to replace the existing Chapter House which has outdated installations and insufficient space. The new building is to be culturally appropriate for the area, energy efficient, and to be constructed under...
by Carlos Murrieta | Feb 22, 2016
This 11,309 GSF facility was designed as the center of operation for the Navajo Transit System in Fort Defiance AZ. The center incorporates the minimum needs for their Bus float with a shop area with two bays, expandable to 4, lift station for 1 bus, tool and parts...
by Carlos Murrieta | Feb 22, 2016
This new 11,000 SF facility was designed to represent a new ‘Self-Sufficient’ Navajo Nation. Designed in rammed earth construction, the building has many sustainable design features including: Solar Walls to provide auxiliary warm air to HVAC equipment; Solar Panels...
by Carlos Murrieta | Feb 22, 2016
The 3600 GSF renovation/construction project presented numerous challenges to the design team. The floor plan was never designed to accommodate the WIC services program and was extremely crowded and inefficient. There was very little natural lighting and the building...
by Carlos Murrieta | Feb 22, 2016